District heating

Guangzhou

Savosolar has been selected to deliver a tracker mounted solar thermal plant for the district heating of Nansha, Guanghzou, China. The system is combined with a geothermal seasonal storage and a chiller (not in Savosolar’s scope of supply) which allow the owner to deliver healthy energy, both heating and cooling, to its customers.

Location

China

Construction status

Finished

Installation year

2022

Solution type

District heating

Number of collectors

72

Collector Area

940 m2
, gross

Collector Type

Savo 12 S

Power

700 kW

Energy production

520
MWh/a

Grenaa Varmeværk

Savosolar was happy to sign its so far largest delivery contract with Grenaa Varmeværk in 2018. Savosolar’s highly efficient Savo 15 premium collectors are installed right next to an existing solar collector field which had been commissioned in 2014.

In this turn-key project Savosolar acts as the main contractor enlarging the solar fraction of the district heating network. Its operator, Grenaa Varmeværk, is producing about 146,000 MWh of heat per year. By using solar thermal it has managed to keep their customers´ heat price among the lowest in the whole of Denmark.

The new solar field with Savosolar collectors will increase the overall solar yield and ensure lowest energy production costs also in the future.

Suur-Savon Sähkö

Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Suur-Savon Sähkö Oy for its district heating network in Puumala, which supplies households with healthy heating. In this hybrid installation the solar thermal system is producing both, high-temperature heat to district heating supply pipe and also low-temperature heat to improve heat pump plant COP.

Fernwärme Ettenheim

As a general contractor, Savosolar built a solar thermal system on behalf of Fernwärme Ettenheim GmbH for the largest possible solar feed-in into the existing district heating network. 112 pieces Savo 15 SG-M large collectors generate fuel-free healthy heat, which is temporarily stored in two 100 m³ buffer storage tanks.
This also allows the operating hours of the CHP and the biomass boiler to be optimized. The scope of delivery included the fence and video surveillance system, as well as the creation of a meager meadow to enrich local biodiversity.

The construction work was temporarily interrupted due to the COVID19 restrictions. All system hydraulics were completely housed in a container. The keys were handed over in October 2020.

A PV system still to be built on the east side will generate the electricity for the pumps in the future.

The picture on the left shows the boiler house and the buffer storage tank. Handover of keys from Jari Varjotie, CEO Savosolar Oyj, to Peter Blaser, managing director of the customer.