Bad Rappenau

Finished

UNDER CONSTRUCTION

Bad Rappenau, Germany (largest flat plate collector plant in Germany)

Savosolar has been selected as general contractor to build a +20 MW solar thermal system on behalf of Bauer Holzenergie GmbH for its district heating network, which supplies households and an industrial process for drying fruits with healthy heating. Only about 1,800 pieces of Savo 16S large scale high performance flat plate collectors are sufficient to getting combined with an 8,000 m³ heat storage tank and
provide carbon free heat for the needs of all connected consumers.
Additionally, a PV system will be built on site to generate the electricity consumed by the solar pumps, thus
unburdening the local power grid.

Location

Germany

Construction status

Finished

Installation year

2024

Solution type

District heating, Industrial process heating

Number of collectors

1 809

Collector Area

26 827 m2
, gross

Collector Type

Savo 16 S

Power

20.4 MW

Energy production

13 000
MWh/a

Issoudun

With a size over 13,000 m2, this system is the second largest solar heating system in France and the second largest solar thermal system for industrial process heating in Europe.  Savosolar has delivered the largest part of the whole solar thermal plant including the solar collector field, civil work, piping and design and delivery of heat exchange station.

Kyotherm and its affiliate Kyotherm Solar are investment companies which specialize in the third-party financing of renewable heat and energy efficiency projects. Kyotherm Solar is selling heat from this system to a malt drying factory, which is operated by Malteries Franco-Suisses.

Lübeck

Under construction

Lübeck, Germany (largest solar thermal plant in Schleswig-Holstein federal state)

Savosolar has been selected as general contractor to build a 9 MW solar thermal system on behalf of Stadtwerke Lübeck Energie GmbH for its district heating network, which supplies households in the Moisling city district with healthy heating. Only 788 pieces of Savo 16S large scale high performance flat plate collectors are sufficient to getting combined with an 3,000 m³ heat storage tank and produce carbon free heat for the needs of all connected consumers.
Additionally, a PV system will be built on site to generate the electricity consumed by the solar pumps, thus unburdening the local power grid.
The scope of supply includes also all the land works, the construction of a technical building and the supervision system to operate the plant in automatic mode.

Verdun

The solar thermal plant of Verdun will supply 8 GWh of decarbonized heat for the Lacto Serum factory nearby. With an area close to 15,000 m2, it became the largest solar thermal installation for industrial process heat in Europe, exceeding Issoudun’s plant, commissioned in 2021 by Savosolar, with a few hundreds m2.

This plant is the property of Newheat and Savosolar has been chosen to realize the solar thermal field as a turnkey project.